Abstract:
Temporary equipment on bridge decks can alter the aerodynamic shape of the main girder and potentially induce vortex-induced vibration, posing a threat to construction and operational safety. Taking the double-deck truss girder of the Changtai Yangtze River Bridge as the engineering background, this paper investigates the vortex-induced vibration response characteristics of the girder sections under completed-bridge state and temporary-equipment conditions through section model wind tunnel tests, and examines the control effectiveness of vortex generators on vortex-induced vibration. The results show that no vortex-induced vibration occurs on the completed-bridge section; at −3° angle of attack, temporary equipment induces significant vertical vortex-induced vibration of the section model. Mechanism analysis reveals that vortex generators produce streamwise vortex pairs, which impose spanwise perturbations on the wake, promoting the three-dimensional instability of large-scale spanwise vortices and their transition to streamwise vortex pairs, thereby attenuating the periodic aerodynamic forces. The vertical vortex-induced vibration is completely suppressed when the dimensionless height and spanwise spacing of vortex generators are 0.25 and 3, respectively.